Transportation of transformer TC-1250000/330-U1
Transportation of the TC-1250000/330-U1 transformer in the amount of 1 unit for repair and restoration work from the Kalinin NPP to the workshop at the plant in Metallostroy "SMTT. High-voltage solutions".

Transportation from the NPP to "SMTT" was organized on a transporter by rail.
The company OOO "M-GRUPP" organized the assembly of the portal system and reloading from the railway tracks
to a modular self-propelled trolley in the SPLIT configuration - 18 axles for subsequent rolling into the workshop.

After the repair and restoration work, inside the workshop, M-GRUPP specialists reassembled the modular axles
in the DOUBLE configuration for transporting the transformer for testing together with the oil poured into it.

After the tests, in the reverse order, the transformer was taken outside
and loaded onto a railway transporter using the portal system.
Transportation of transformer TC-1250000/330-U1
Cargo dimensions
12,86 х 3,61 х 5,05

Weight

465т

Year

2024 г.

Route

Kalinin NPP - Metallostroy settlement «SMTT. Vysokovol'tnyye resheniya»

OUR PROJECTS
Made on
Tilda